Projects
Reactive Works - Carillion Plc
Hallmark
has provided reactive works services to Carillion Plc since 2006. This work
entails both standard and emergency call outs (attending within 2 hours)
to substations, both primary and secondary, to make the site safe. We are
able to clean graffiti and remove fly tipping. Quotes are then submitted
for any further work that may be required to bring the security up to a
satisfactory level this will include fencing, doors, gates, windows and
walls.
Bicker Fen - Enterprise
This
is the largest compound that Hallmark has fenced within the Central Networks
area. It included over 500m of high security palisade fencing and ground
beam with three sets of gates around at substation adjacent to the National
Grid site in Lincolnshire. This was part of the wind farm development in
the Bicker area. The site was showcased for excellent health and safety
standards. Hallmark worked closely with Enterprise on similar projects since
including sealing ends pylons and extensions to primary substations.
Church Over - Alpha Contruction
Hallmark
installed fencing around a substation on the edge of a gas compression station.
Health and safety was a key issue on site due to the double hazard of electricity
and gas. This site required double fencing of steel palisade and wooden
post and rail.
Castle Mead - Enterprise
Following
the floods of 2007 Castle Meads substation was flooded bringing whole of
the south midlands networks to a halt. Hallmark was commissioned to manufacture
and install the new flood defence system onsite.
This involved working closely with our structural engineers and designers
to provide a bespoke system to ensure the safety of the substation in future
years.
Earthing Services - Various Clients
Hallmark
has installed earthing upgrades and extensions on sites across the Midlands
including Hillmorton for Carillion Plc and Rowton for IUS. Hallmark has
also remodelled the hottest site across the west area of the Central Networks
region.